PulaIstarskaكرواتيا52215
العقارات الصفحة الرئيسية المخصصة لغرض البيع كائنة فيPula Istarska 52215 كرواتيا 3غرف النوم, 4 الحمامات, الاتجاه جنوبي, مشمس حاليًاالبيع،Pula Istarska 52215 كرواتيا مدرجة لـUS$ 719,428. إذا كان العقار يقع فيPula Istarska 52215 كرواتيا فإنه ليس ما تبحث عنه، ابحث في كرواتيا العقارات للاطّلاع علىمنازل أخرى، بغرضالبيع الكائنة فيPula .
عدد MLS: 101113-563
US$ 719,428 USD
€ 670,000 EUR
- غرف النوم
- 3
- الحمامات
- 4
- المنزل/مساحة مخصصة
- 174m²
سمات العقار
السمات الرئيسية
تفاصيل الإنشاء
- سنة البناء
- 2024
- حالة المبنى
- بناء جديد
- الطراز
- مشمس
المساحة
- حجم العقار
- 174m²
- قطعة أرض/مساحة مخصصة
- 1,000m²
- غرف النوم
- 3
- الحمامات
- 4
- إجمالي الغرف
- 4
الوصف
ISTRIA, VODNJAN, GROUND HOUSE WITH SWIMMING POOL, 3 BR, WITH VIEW OF OLIVE GROVES
In a beautiful place not far from Vodnjan, we are selling a house under construction, surrounded by greenery, olive trees, vineyards and other luxurious villas.
It is a building with a living area of 173 m2 on a plot of land of 1000 m2.
The "heart" of the living space consists of a spacious kitchen with a dining room and a living room full of daylight provided by large glass walls. From this area you can access a covered terrace and a swimming pool with a sunbathing area.
The house has 3 large bedrooms with walk-in wardrobes and private bathrooms, and 1 guest toilet.
There are two parking spaces.
This modern one-story house attracts attention with its landscaped surroundings and a 30m2 swimming pool, and it is one of the 8 villas of this unique project.
It is sold on a "turnkey" basis, and complete interior decoration is possible upon agreement with the client.
TECHNICAL CHARACTERISTICS:
Windows and doors: Alu profiles
Heating and cooling with a heat pump
Underfloor heating
Outdoor pool: heat pump heating.
Gross area: 173.93 m2
Net area: 139.81 m2
Pool size: 30.00 m2
Plot size: 1,000.88 m2
The price of an individual villa is €670,000 + VAT. It is also possible to buy a villa through the company. Villa floor plan and settlement plan: among the photos
Completion of construction: June 2024