104 Chilko CourtChesneeSouth CarolinaUnited States29323
The Home for Sale located at 104 Chilko Court Chesnee South Carolina 29323 with 4 bedrooms, 4 bathrooms is currently for Sale, 104 Chilko Court Chesnee South Carolina 29323 is listed for $649,000. If the property located at 104 Chilko Court Chesnee South Carolina 29323 isn't what you're looking for, search South Carolina Real Estate to see other Homes for Sale in Chesnee .
MLS#: 310774
$649,000 USD
- Bedrooms
- 4
- Bathrooms
- 4
Property features
Construction details
- Year built
- 2010
- Roofing
- composition/shingle
Other features
- Property features
- Porch-screenedFireplace
- Appliances
- WasherRefrigeratorDryerDishwasher
Description
Exterior brick and stone home on 1/2 acre lot, rear screened porch and deck. The interior has arched openings, coffered ceilings, dining room, office with french doors, gas fireplace, and custom trim mouldings. Custom kitchen features pull-out drawers, spice racks, solid surface counters, gas five burner cooktop and refrigerator, new in 2022, and a large breakfast area. Laundry room with sink. Upstairs has two additional bedrooms that share a jack-n-jill bath. One of the bedrooms has access to a large walk in closet, and attic access. Huge bonus room. Wood blinds, custom stamped driveway. Lots of upgrades have been done since the home was purchased in 2022. Upgrades in 2023 include bonus room skylights, waterproof laminate flooring in upstairs bedrooms and bonus room, sun tunnels in upstairs hallway, Rinnai tankless water heater, acrylic shower with frameless glass in guest bath, gutters and Leaffilter guards, new roof, porch screening, new washer and dryer. In 2024, frameless shower enclosure in master bath was installed. Detached storage racks around the perimeter of the garage remain. Detached coat rack and coat rack/bench in mud area in garage remain. Refrigerator (2) in garage remain. Satellite Dish is non functioning. Seller has scheduled sod to be placed on areas of rear yard and right side of front yard where lawn was damaged during repairs. Work is expected to begin mid May.