LjubljanaOsrednjeslovenska斯洛文尼亚1000
位于Ljubljana Osrednjeslovenska 1000 斯洛文尼亚为出售的主页目前在出售,Ljubljana Osrednjeslovenska 1000 斯洛文尼亚的售价为US$1,074,411。如果您对位于Ljubljana Osrednjeslovenska 1000 斯洛文尼亚的房产不感兴趣,可以搜索斯洛文尼亚Real Estate,查看其他出售在Ljubljana的住宅 。
MLS#: 101215-185
US$1,074,411 USD
€990,000 EUR
- 房屋/场地面积
- 255m²
房产特点
建造详情
- 建造于
- 2022
面积
- 房产面积
- 255m²
描述
In a quiet part of the city, in a cul-de-sac and away from the nearby roads, the construction of two detached buildings with four modern duplex apartments has begun.
In addition to the luxurious living area, each apartment will have two terraces and a ground floor unit with its own lawn. Recreational areas, city infrastructure and motorway access are available in the immediate vicinity.
"MIVKA" apartments are designed in a modern way, with a selection of the best technologically advanced materials and compliance with the latest design and construction guidelines for the conscious user.
The facilities will be prefabricated, built of solid wooden CLT panels. Cross-laminated timber panels (CLT) are one of the most modern semi-finished products for construction. The advantages of a solid wooden house built of CLT panels are in fast and quality construction, enable construction and architecturally demanding construction of buildings, no deformation due to moisture, provide high strength and rigidity, high level of fire and seismic safety, construction is light and compact, the highly efficient material ensures low heating and cooling costs.
Each unit has a large living area (58-60m2), a master bedroom with a bathroom, 2 or 3 additional bedrooms with its own bathroom, a work area, toilets for daily use and guests, uitily and a pantry. All rooms will be very bright and airy. Each unit has its own separate bike shed on the ground floor of the building.
Parking spaces will be owned in front of the building.
Hot-water heating of the building will be carried out via floor condensing gas boilers. Heating will be floor, a cooling system is also provided. All apartments will be distinguished by quality finishing with selected materials.
Construction will be completed in the summer of 2022, and the units will be ready for takeover with a usable turnkey permit in the fall of 2022.
The General Terms and Conditions of Sale have been adopted for the facility and purchase is already possible! Call 031 662 497.